Project: Westport Business & Technology Park
 
     
Location: Westport Town, Co. Mayo
 
Client: The Industrial Development Authority
Western Region
     
Project Team:
Mr. John Ward, Director
Mr. John Montgomery, Project Landscape Architect
 
 
Size approx.: 80 Ha.
 
 
     
Team Members:
Engineering PJ Tobin & Co. Galway
Architecture Taylor architects, Castlebar
 
Year of Project 2002-2004
 
 
     
 
   
 
 
Description:
 
     
 
Westport business & technology park is a new business park for Westport. The park occupies a sloping site to the north of the existing Allergan facility.

The brief for the project called for an informal campus style of entrance. As the site is sloping, there was a requirement to develop a concept for the grading of the site and the creation of viable building areas.

The design concept which was developed was based on the precedent of the existing demesne wall which runs around the perimeter of Westport House. The walls form terraces and define landscape spaces. A number of different configurations have been introduced into the wall in terms of water, steps, terraces and secret garden areas. The concept of these interventions is a modern interpretation of the demesne wall; open and punctuated, i.e plural, in contrast with the historical demesne wall which was closed and exclusive.

The detailed design and development of the entrance area, roadways and services was developed in conjunction with the project engineers. The initial infrastructural works entailed the development of an attenuation feature, walls, distinctive planting on the main roundabout, signage and the detailing of all roadside pavements and street furniture.

The completion of the first phase also involved the establishment of a 10 metre wide woodland copse around the perimeter of the site area. The Practice has been retained to complete landscape schemes for each of the buildings as they are constructed, thus retaining an overall landscape consistency within the constructed park.

 
     