back to homepage    
 
home | profile | clients | awards | portfolio | projects | recruitment | contact
 
 
 
     
   
 
 

National Infrastructure (LVIA)

Murray & Associates have been involved as specialist responsible for Landscape & Visual Impact Assessment (LVIA) in many national infrastructure projects.  Our approach is to work closely with the design team to ensure that the best fit for each project is achieved in an environmentally responsible and achievable manner.

The following is a selection of some of our LVIA work:

N25 Waterford to Glenmore Route Selection (2008-09)
Route selection and constraints study.

Metro West – Tallaght to Dublin Airport (2008-09)
Landscape and visual impact assessment for EIS. Preparation of mitigation scheme.

LUAS Line F – Lucan to Dublin City Centre (2008-09)
Route selection and constraints study, landscape and visual impact assessment for EIS.

Mountmellick to Portlaoise 38kV Powerline (2009)
Route selection and constraints study.

N18 Oranmore-Gort National Primary Road, Galway (2004-06)
Landscape and visual impact assessment for EIS. Preparation of mitigation scheme.  Attendance at oral hearing.

N4 Dromod-Roosky Bypass Road, Cos. Leitrim & Longford (2004-05)
Landscape and visual impact assessment for EIS. Preparation of mitigation scheme.  Attendance at Oral Hearing.

N4 Edgeworthstown Bypass, Co. Longford (2004-05)
Landscape and visual impact assessment for EIS. Preparation of mitigation scheme.

N2 Slane By Pass scheme (2003-06)
Constraints study.  Evaluation of route alternatives. Landscape and visual impact assessment.  Preparation of mitigation scheme.

N5 Westport-Castlebar Road, Co Mayo (2003-04)
Landscape and visual impact assessment for EIS. Preparation of mitigation scheme.
     
N2 Monaghan By Pass Scheme (2001-06)
Landscape and visual impact assessment.  Preparation of mitigation scheme. Preparation of contract documentation.

N6 Ballinasloe to Galway Scheme (2000-2006)
Route selection and constraints study, landscape and visual impact assessment for EIS.  Preparation of mitigation scheme.

M4 KEK Motorway Scheme (1999-2001)
Route selection and constraints study, landscape and visual impact assessment for EIS.

M7 Heath Mayfield Motorway Scheme (1995-1998)
Route selection and constraints study, landscape and visual impact assessment for EIS